Investigate open and unlinked purchase documents
Quick summary: A purchase clearing-account balance can arise from timing differences or incorrect links. Complete or correct the underlying business event before clearing a balance.
Before you start
Section titled “Before you start”You need access to purchase orders, receipts and bills. Before validating or cancelling an old document, agree the actual situation and date with the responsible colleague and accounting.
Choose the next step
Section titled “Choose the next step”| Finding | What to check | Next step |
|---|---|---|
| The receipt is completed, but the bill is a draft or missing. | Supplier bill, date, order and received quantity. | Process the bill normally; do not clear a valid unbilled receipt. |
| The bill is posted, but the receipt is pending. | Whether goods are missing or the receipt was simply never recorded. | Process the existing receipt according to the verified actual situation. |
| An old order has a pending return. | Whether it represents an actual return, a quantity correction or a duplicate. | Review and cancel an unnecessary open document, or complete a necessary one. Check reservations. |
| The missing quantity belongs to several project locations. | Delivery note, purpose and actual location of the goods. | Agree the allocation with the responsible person and use it on the receipt. |
| A bill line has no order link. | Product, supplier, quantity, previously billed lines and duplicates. | Link only a proven matching line through a supported workflow. Without evidence, agree the accounting treatment with accounting. |
Review procedure
Section titled “Review procedure”- Open the order and its receipts, returns, bills and credit notes. Compare lines for each product.
- Sum completed receipts, completed returns and net posted bills separately. Keep drafts and pending transfers separate.
- Check units of measure and locations. An identical product name on two documents does not prove they belong to the same purchase.
- Establish the business purpose of each old open document. Record the decision before validating or cancelling it.
- Correct the link or quantity first, then follow check valuation after a return or additional receipt.
- Review the general ledger again and retain an explanation for the remaining open events.
Example
Section titled “Example”A bill contains 275 kg, but completed receipts total 265 kg across two projects. The 10 kg difference does not tell you which project received the goods. Do not automatically assign an additional receipt to the first location. Ask the responsible person to confirm the location and actual situation, then correct quantity and value.
A bill does not always prove a stock receipt
Section titled “A bill does not always prove a stock receipt”A linked purchase order may contain a service or a product without inventory tracking. Before applying a purchase–stock–consumption flow, check Track Inventory and an actual completed, valued receipt. Do not change every line’s account on a mixed bill merely because one line has a purchase link.